Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
人人妻人人玩人人澡人人爽| 国产精品人妻一区夜夜爱| 一 级 黄 色 片一录像厅| 免费不卡在线观看AV| 中国XXXXXLMEDJYF| 夜夜躁天天躁很躁| 夫妇交换性3中文字幕| 亚洲精品第一国产综合野草社区| 男男调教后菊撑开扩张A片| 解开警花的裙子猛烈进入| 大乳丰满人妻中文字幕日本| 边做饭边被躁国产| 三上悠亚上司の在线播放| 五月丁香欧美综合亚洲AV| JIZZJIZZ日本护士水好多| 真人性做爰无遮A片免费| 亚洲国产精品无码| 精品白嫩BBWBBWBBW| 国产成人无码A区在线观看视频| 亚洲AV无码国产一区二区| 日本双人XXOO吃奶视频| 老妇女性较大毛片| 波多野结衣人妻厨房大战| 国产毛A片啊久久久久久| 国内永久免费CRM系统| 穷山沟里的荒唐性史| 色综合AV综合无码综合网站| 日韩毛片无码永久免费看| 亚洲A∨无码一区二区三区| 亚洲国产天堂久久综合| 女朋友水太多进去就软了| 国产深夜男女无套内射| 我在开会他在下添好爽| 美女视频黄是免费| 高H短篇辣肉各种姿势自慰H| 精品无码人妻一区二区三区不卡| 激情五月色综合国产精品| 无码国产69精品久久久久孕妇| 粉嫩虎白扒开小泬| 国产熟女高潮精品视频AV| 日木AV无码专区亚洲AV毛片|