Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
苍井空被躁50分钟5分钟免费| 公翁大龟挺进秀婷小说| 富婆性俱乐部纵欲狂| 波多野结衣人妻厨房大战| 邻居的色诱中文字幕| 老师真嫩真紧好爽20P| 爽欲亲伦96部分| 国产精品无码专区AV在线播放| 四十路の五十路熟女豊満| 久久久久久精品成人免费图片| 国产做A爰片久久毛片A片 | 欧美精品久久96人妻无码| 影音先锋人妻啪啪AV资源网站 | 香港三级日本三级妇三级| 色婷婷久久综合中文久久蜜桃AV| AV人摸人人人澡人人超碰下载| 少妇和公翁系列小说| 亚洲中文久久精品无码WW16| 欧美激情在线视频| 无码AV大香线蕉伊人久久| 中文字幕人妻色偷偷久久 | 妈妈的朋友4在线观看| JULIAANN女医生在办公室| 国产AV无遮挡喷水白浆桃花视频| 精品无码国产一区二区三区51安| 国产精品无码一区二区三区| 中日AV乱码一区二区三区乱码| 性夜影院爽黄a爽免费看不卡 | 国产中文精品无码欧美综合小说| 邻居一晚让我高潮3次正常吗| 秘书被老板CAO到合不拢腿| 欧洲熟妇色XXXX欧美老妇免费| 女人被狂躁免费看30分钟| jizz日本| 高潮娇喘抽搐A片无码黄| 精品无码国产一区二区三区51安 | 国产真人无遮挡作爱免费视频| 日本护士野外XXXHD| 国产精品久久久久一区二区三区| 黃色A片三級三級三級| 初品尝的美艳人妻|